|
    Theme
    National Verified Story

    Sindh's wider market: Thar coal gets pricing overhaul

    Saba Qamar•November 6, 2026• 2 min read
    Text Size
    Sindh's wider market: Thar coal gets pricing overhaul
    National CoverageAman-e-Pakistan Digital Desk
    Key Story Executive Summary
    Quick Read

    “Sindh Chief Minister Syed Murad Ali Shah has approved a revised pricing mechanism for Thar coal sales to buyers other than independent power producers (IPPs), in a major push to expand the market for …”

    The decisions were taken at the 31st meeting of the Thar Coal and Energy Board, chaired by the chief minister and attended by federal ministers, where the board also approved tariff adjustments and reviewed progress on mining, transportation and energy infrastructure projects.

    The revised Chapter 3 of the Thar Coal Pricing Framework 2015 establishes a transparent mechanism for determining prices for non-IPP buyers, distinguishing between short- and long-term coal supply arrangements. It also introduces safeguards to prevent double recovery of costs and ensure that benefits associated with capacity charges already paid by electricity consumers are duly credited to them.

    Importantly, costs associated with coal sales to non-IPP buyers will not be passed on through IPP tariffs, protecting existing electricity consumers from additional financial burdens. The framework is aimed at attracting new buyers, encouraging wider industrial use of Thar coal and facilitating long-term investment.

    Key Story Takeaway

    "Stay connected with Aman-e-Pakistan for ongoing live reporting and verified investigative updates."

    Mining capacity expands. The board reviewed progress on the Thar Coal Drying and Briquetting Project in Block-I, designed to reduce coal moisture content from 45% to 18%. With an intake capacity of 30 tonnes and an output of 22 tonnes per hour, the facility is expected to improve coal quality, transportation efficiency and freight economics.

    Federal Energy Minister Sardar Awais Ahmed Khan Leghari congratulated the provincial government on the project's launch. Rail link gathers pace. The Rs90.3 billion Thar Rail Connectivity Project, featuring a 105-kilometre railway line connecting Thar's coal mines to New Chhor, has achieved 68% physical progress.

    Meanwhile, the process of inviting bids for a nine-kilometre double railway line between Bin Qasim and Port Qasim is under way, while construction of the coal-loading station in Block-II has reached 55% completion. Shah directed the Energy Department to complete the loading station by March 2027.

    S

    Written by Saba Qamar

    Aman-e-Pakistan Senior Journalist & Bureau Reporter

    Fact Checked & Verified

    Continue Reading: More in National

    Swipe or click arrows to explore National desk coverage

    Pakistan's LPG demand expected to grow by 8-8.5pc annually, existing infrastructure inadequateNational

    Pakistan's LPG demand expected to grow by 8-8.5pc annually, existing infrastructure inadequate

    Read Story
    Goods transport alliance announces 5pc reduction in freight chargesNational

    Goods transport alliance announces 5pc reduction in freight charges

    Read Story
    Petition filed in PHC to raise girls' marriage age to 18 in KPNational

    Petition filed in PHC to raise girls' marriage age to 18 in KP

    Read Story
    Rana Sanaullah says KP governor's rule to continue until objectives are achievedNational

    Rana Sanaullah says KP governor's rule to continue until objectives are achieved

    Read Story
    Who is supporting terrorism now?National

    Who is supporting terrorism now?

    Read Story
    SC rules federal ombudsman cannot decide complex property disputesNational

    SC rules federal ombudsman cannot decide complex property disputes

    Read Story